会员登录 - 用户注册 - 设为首页 - 加入收藏 - 网站地图 【tl keo bd】PM urges expedited construction of Tân Sơn Nhất airport’s Terminal 3!

【tl keo bd】PM urges expedited construction of Tân Sơn Nhất airport’s Terminal 3

时间:2024-12-23 14:51:38 来源:Nhà cái uy tín 作者:Thể thao 阅读:868次

PM urges expedited construction of Tân Sơn Nhất airport’s Terminal 3

February 12,ânSơnNhấtl keo bd 2024 - 18:55 Your browser does not support the audio element. Being built at the total cost of VNĐ11 trillion (US$450.36 million), T3 will be the largest domestic passenger terminal with a capacity of 20 million passengers a year.
Prime Minister Phạm Minh Chính visits the under-construction Terminal 3 (T3) at Tân Sơn Nhất International Airport in HCM City on Monday. — VNA/VNS Photo Dương Giang

HCM CITY — Prime Minister Phạm Minh Chính urged ministries, sectors, contractors and relevant sides to speed up construction of Terminal 3 (T3) at Tân Sơn Nhất International Airport in HCM City so that it can be completed before April 30, 2025 to mark 50th anniversary of the Liberation of the South and National Reunification Day.

Inspecting construction at the site on February 12 (the third day of the first lunar month), PM Chính expressed his delight over the enthusiastic and bustling working atmosphere at the construction site even during the Tết holiday.

He hailed the concerted efforts of HCM City, the Ministry of Transport and the Airports Corporation of Việt Nam (ACV) in accelerating the project, while asking contractors to re-schedule working progress, mobilise vehicles, equipment and human resources, improve construction to hasten the project, and work to ensure construction quality.

The PM also instructed the municipal authority and competent sides to join hands to smoothly roll out construction of supporting facilities, including transport connection with nearby areas and Long Thành International Airport.

Being built at the total cost of VNĐ11 trillion (US$450.36 million), T3 will be the largest domestic passenger terminal with a capacity of 20 million passengers a year. It will be capable of handling 7,000 passengers per hour during peak hours and will accommodate all types of aircraft. It is designed to have four floors, one basement, 90 counters, 27 boarding gates and 25 security gates.

Thanks to the drastic direction and resolve from the Government, HCM City and relevant sides, bottlenecks were removed for the project, resulting in a modern terminal being shaped up after six months of construction.

According to the ACV, nearly 1,400 engineers and workers, 16 tower cranes, and equipment were dispatched to the construction site at peak time to ensure that the progress is in line with schedule.

Upon completion, the project is expected to relieve congestion at the country’s largest airport. — VNS

The construction of the Terminal 3 (T3) at Tân Sơn Nhất International Airport in HCM City. — VNA/VNS Photo Dương Giang

(责任编辑:Cúp C1)

相关内容
  • Yêu nhau 5 năm và 3 lần phá thai...
  • Cử tri xã An Phú kiến nghị nâng cấp hệ thống điện trên địa bàn
  • Biểu diễn chương trình nghệ thuật phục vụ đồng bào Khmer ở xã Hưng Hội
  • Đại hội Chi hội Luật gia Sở Tư pháp Bạc Liêu lần thứ IV
  • Hình ảnh Hà Nội đón mưa
  • Ô tô tập lái "chiếm trọn" làn tốc độ cao, bảo sao đi ra đường là ức chế
  • TP. Bạc Liêu: Tai nạn giao thông trong nội ô TP. Bạc Liêu, 1 phụ nữ tử vong
  • Giai đoạn 2021
推荐内容
  • Giữ 5% tiền lãi trên hợp đồng vay vốn chi vào việc gì?
  • Kỳ họp thứ tư, Quốc hội khóa XV: Quốc hội bỏ phiếu miễn nhiệm một số chức danh
  • Bình Phước: Tập huấn kỹ năng hoạt động của đại biểu HĐND các cấp
  • Thủ tướng Chính phủ
  • Người thứ 3 thừa xinh đẹp và trơ trẽn
  • Các tổ đại biểu HĐND 2 cấp tiếp xúc cử tri huyện Phước Long và TP. Bạc Liêu