【dự đoán kèo hôm nay】Another senior official in jail for quality issues in Đà Nẵng
Another senior official in jail for quality issues in Đà Nẵng-Quảng Nam expressway project
May 12,ĐàNẵdự đoán kèo hôm nay 2020 - 11:51 Police on Monday said they have arrested and launched an investigation against a senior leader of the State-owned Việt Nam Expressway Corporation (VEC) for violations in handling a key project in central Việt Nam.Lê Quang Hào, Deputy Director-General of Việt Nam Expressway Corporation. |
HÀ NỘI — Police on Monday said they have arrested and launched an investigation against a senior leader of the State-owned Việt Nam Expressway Corporation (VEC) for violations in handling a key project in central Việt Nam.
Lê Quang Hào, Deputy Director-General of VEC, was also the head of the committee in charge of conducting quality inspection of Quảng Nam-Đà Nẵng expressway, which was put into operation in September 2018. Reports quickly emerged regarding the road's questionable construction quality, with potholes and cracks developing shortly after its opening that required urgent maintenance.
Hào was charged with “violating construction regulations, leading to serious consequences” under the Việt Nam Penal Code 2015.
According to the Investigation Police Agency, Hào’s wrongdoing involves faulty pre-acceptance testing of the construction project of the expressway (specifically, the 65km Tuý Loan-Tam Kỳ section) that is not in line with regulations and provisions of the law, not in compliance with the approved standards, technical instructions, and the project design requirements, resulting in unqualified works being put into use, causing very serious consequences.
The police are expanding the investigation and consolidating the case to clarify the role of each of the suspects involved in the case.
Previously, Vietnamese police detained and investigated eight people, including the former director of the Đà Nẵng-Quảng Ngãi project management unit and other senior executives of sub-project management units.
The expressway has a total length of over 139.2km, running through Đà Nẵng City, Quảng Nam and Quảng Ngãi provinces, which constitutes a major part of the central key economic region of the country.
With construction beginning in 2013, the expressway's total costs came to upwards of VNĐ34.5 trillion (US$1.64 billion), including $798.5 million in loans from the Japan International Cooperation Agency (JICA) and over $590 million from the World Bank (WB), with the remainder sourced from the Vietnamese Government's budget. — VNS
(责任编辑:Nhận Định Bóng Đá)
- ·Vỡ nợ thẻ tín dụng của Mỹ cao kỷ lục
- ·Chủ tịch UBND tỉnh có quyền xóa nợ tiền phạt, chậm nộp thuế dưới 5 tỷ đồng
- ·Từng bước loại bỏ các sản phẩm hiệu suất thấp, tiêu tốn nhiều năng lượng
- ·Sản xuất kinh doanh hồi phục, thu nội địa giữ nhịp tăng trưởng khá
- ·Nhà bác học Isaac Newton chơi thua cổ phiếu thế nào?
- ·Hội chợ triển lãm Việt
- ·Giá vàng hôm nay 28/10: Ngược chiều thế giới, vàng tụt giảm
- ·Cục Thuế Bắc Ninh tuyên dương 222 người nộp thuế tiêu biểu
- ·Nhận định, soi kèo Perth Glory vs Western United, 17h45 ngày 3/1: Tin vào cửa trên
- ·Thu ngân sách tại Hải quan Hải Phòng có chiều hướng giảm mạnh
- ·Nhận định, soi kèo Al Raed vs Al Jabalain, 19h30 ngày 6/1: Bất ngờ?
- ·Hải quan TP Hồ Chí Minh: Rà soát container tồn đọng tại cảng biển
- ·Bình Dương: Thông quan hơn 38 triệu USD hàng hóa xuất nhập khẩu trong dịp lễ 2/9
- ·Giá vàng tăng 700 nghìn đồng/lượng, người dân tranh thủ mua vào
- ·Về căn cứ xưa, nghe kể chuyện chở che bộ đội đánh giặc...
- ·Chị gái ông Tuấn Gelex làm chủ tịch Chứng khoán VIX
- ·100% thủ tục hành chính thuế được giao dịch điện tử cấp độ 3, 4 vào năm 2030
- ·Công nghiệp hỗ trợ: Tăng tốc phát triển, nâng cao vị thế trong chuỗi giá trị toàn cầu
- ·SHB thuê máy bay đưa cổ động viên sang Thái Lan tiếp lửa đội tuyển Việt Nam
- ·Hải quan Quảng Trị thu ngân sách đạt 1.300 tỷ đồng