会员登录 - 用户注册 - 设为首页 - 加入收藏 - 网站地图 【kq u23 vn】PM Chính urges swift construction of Gia Bình Airport Project!

【kq u23 vn】PM Chính urges swift construction of Gia Bình Airport Project

时间:2025-01-26 17:28:17 来源:Nhà cái uy tín 作者:Cúp C1 阅读:661次

PM Chính urges swift construction of Gia Bình Airport Project

December 10,ínhurgesswiftconstructionofGiaBìkq u23 vn 2024 - 21:46 Your browser does not support the audio element. The airport is designed to serve command and control missions, train pilots and ensure combat readiness for the Việt Nam People's Public Security Air Force.
Prime Minister Phạm Minh Chính inspects the Gia Bình Airport Construction Project model. VNA/VNS Photo

BẮC NINH — Emphasising that Gia Bình Airport is a national key project, of critical importance to the system of defence and security infrastructure, Prime Minister Phạm Minh Chính called for it to be built as rapidly as possible.

The Prime Minister requested the fastest construction progress, with the highest quality standards and the lowest costs, aiming for the project to be completed within 18 months.

He made the request at the groundbreaking ceremony of the Gia Bình Airport construction project in Gia Bình District, Bắc Ninh Province, on Tuesday. The airport is designed to serve command and control missions, for pilot training, and it will offer combat readiness for the Việt Nam People's Public Security Air Force.

Gia Bình Airport is a specialised defence and security facility. In addition to its primary mission of supporting training and combat readiness missions, the airport is dedicated to official flights of Party and State leaders, as well as international politicians, but it will also be able to handle cargo and passenger transport when requested.

On September 17, 2024, the Prime Minister signed Decision No. 98/QĐ-TTg, approving the investment policy for the Gia Bình Airport construction project.

In the first phase, the airport will be built as a specialised facility with a 1,500-metre runway, covering approximately 125 hectares in Xuân Lai Commune and Gia Bình Town. The total investment for the project is estimated at VNĐ4.43 trillion (US$174.6 million), and it is expected to be completed in time for the 14th National Party Congress.

Speaking at the event, PM Chính noted that Việt Nam is currently focusing on implementing three strategic breakthroughs, including infrastructure development, particularly in transportation and aviation. This involves investment in airport systems across the north, central and south regions, including dual-use airports that simultaneously support economic growth, national development, and defence and security needs.

The PM commended the Ministry of Public Security, relevant ministries and sectors, as well as Bắc Ninh Province for effectively addressing various challenges, particularly regarding land, investment and funding procedures, to ensure the project stayed on schedule. He extended special thanks to the local residents for their willingness to allocate land for the facility.

PM Chính urged the rapid implementation of the first phase and instructed the Ministry of Public Security to prepare the necessary procedures and conditions for the second phase.

He asked Bắc Ninh authorities to coordinate closely with the Ministry of Public Security to implement the first phase and prepare for the second. He also emphasised the need to consider constructing a road from the airport to downtown Hà Nội, with a width of 80-100 metres.

The Ministry of Transport and the Ministry of National Defence were instructed to collaborate with the Ministry of Public Security, Bắc Ninh Province, and other relevant agencies to prepare for the second phase and develop dual-use infrastructure and an airport ecosystem.

The Government leader directed contractors to adhere strictly to the timelines, ensure quality, avoid cost overruns, and uphold labour safety and environmental standards, with the goal of completing the project before December 31, 2025.

In addition, he emphasised the need to ensure the quality of life of the residents displaced by the project. — VNS

(责任编辑:Ngoại Hạng Anh)

相关内容
  • Thời tiết hôm nay 11/11: Bão Yinxing đổi hướng về Hoàng Sa, miền Trung sắp mưa lớn
  • Dự kiến thử nghiệm vắcxin COVID
  • Việt Nam không ghi nhận ca mắc COVID
  • Không chuyển mục đích sử dụng đất ở Tân Thành là đúng
  • Chứng khoán ngày 6/1: BID và VCB nâng đỡ, VN
  • Bình Long: 1.098 người được tiêm phòng Covid
  • Chơn Thành hỗ trợ kinh phí cho đảng viên bị mắc bệnh hiểm nghèo
  • Hớn Quản: 150 VĐV tham gia Giải bóng chuyền DTTS và tôn giáo mở rộng
推荐内容
  • Google Photos tròn 1 tuổi, 24 tỉ ảnh “tự sướng”
  • Nghĩa tình một chuyến đi
  • Liên thông bảo hiểm y tế tuyến tỉnh: Người dân mừng, bệnh viện lo
  • Doanh nghiệp có được đóng BHXH theo mức lương thấp hơn hợp đồng lao động?
  • Nhận định, soi kèo Brothers Union vs Fakirapool Young Mens, 15h45 ngày 3/1: Tưng bừng bàn thắng
  • Thành phố Đồng Xoài tặng thiết bị công nghệ cho chốt kiểm soát dịch Covid