会员登录 - 用户注册 - 设为首页 - 加入收藏 - 网站地图 【kết quả hạng nhất pháp】PM urges expedited construction of Tân Sơn Nhất airport’s Terminal 3!

【kết quả hạng nhất pháp】PM urges expedited construction of Tân Sơn Nhất airport’s Terminal 3

时间:2025-01-25 21:25:54 来源:Nhà cái uy tín 作者:Cúp C2 阅读:795次

PM urges expedited construction of Tân Sơn Nhất airport’s Terminal 3

February 12,ânSơnNhấkết quả hạng nhất pháp 2024 - 18:55 Your browser does not support the audio element. Being built at the total cost of VNĐ11 trillion (US$450.36 million), T3 will be the largest domestic passenger terminal with a capacity of 20 million passengers a year.
Prime Minister Phạm Minh Chính visits the under-construction Terminal 3 (T3) at Tân Sơn Nhất International Airport in HCM City on Monday. — VNA/VNS Photo Dương Giang

HCM CITY — Prime Minister Phạm Minh Chính urged ministries, sectors, contractors and relevant sides to speed up construction of Terminal 3 (T3) at Tân Sơn Nhất International Airport in HCM City so that it can be completed before April 30, 2025 to mark 50th anniversary of the Liberation of the South and National Reunification Day.

Inspecting construction at the site on February 12 (the third day of the first lunar month), PM Chính expressed his delight over the enthusiastic and bustling working atmosphere at the construction site even during the Tết holiday.

He hailed the concerted efforts of HCM City, the Ministry of Transport and the Airports Corporation of Việt Nam (ACV) in accelerating the project, while asking contractors to re-schedule working progress, mobilise vehicles, equipment and human resources, improve construction to hasten the project, and work to ensure construction quality.

The PM also instructed the municipal authority and competent sides to join hands to smoothly roll out construction of supporting facilities, including transport connection with nearby areas and Long Thành International Airport.

Being built at the total cost of VNĐ11 trillion (US$450.36 million), T3 will be the largest domestic passenger terminal with a capacity of 20 million passengers a year. It will be capable of handling 7,000 passengers per hour during peak hours and will accommodate all types of aircraft. It is designed to have four floors, one basement, 90 counters, 27 boarding gates and 25 security gates.

Thanks to the drastic direction and resolve from the Government, HCM City and relevant sides, bottlenecks were removed for the project, resulting in a modern terminal being shaped up after six months of construction.

According to the ACV, nearly 1,400 engineers and workers, 16 tower cranes, and equipment were dispatched to the construction site at peak time to ensure that the progress is in line with schedule.

Upon completion, the project is expected to relieve congestion at the country’s largest airport. — VNS

The construction of the Terminal 3 (T3) at Tân Sơn Nhất International Airport in HCM City. — VNA/VNS Photo Dương Giang

(责任编辑:Nhận Định Bóng Đá)

相关内容
  • Thông xe đường song hành cao tốc TP.HCM
  • Giá vàng hôm nay 10/12: Bắt đầu chu kỳ tăng giá mới
  • Chủ tịch nước kết thúc tốt đẹp chuyến thăm chính thức Peru và Hội nghị APEC
  • Bí quyết tăng trưởng ‘thần tốc’ của chuỗi nhà thuốc FPT Long Châu
  • Cảnh báo lũ ở Bắc Bộ và Thanh Hoá do ảnh hưởng bão số 1
  • Nhân dân tệ tăng giá
  • Điện gió ngoài khơi: Đón gió biển để phát điện
  • Chuyện chưa từng có: Cả năm không giao dịch, cổ phiếu tăng trần 5 lần trong 2 tuần
推荐内容
  • Tạm giữ nam thanh niên ở Quảng Trị nghi hiếp dâm bé gái 5 tuổi
  • Siết chặt quản lý thuế thu nhập cá nhân khi chuyển nhượng nhà, đất
  • Hoàn thuế với hàng tái xuất trả lại chủ hàng như thế nào?
  •  Trưng dụng khẩu trang xuất lậu cho phòng chống dịch
  • Theo dõi chặt chẽ dịch bệnh do virus gây viêm phổi trên người tại Trung Quốc
  • Khu liên hợp thể thao Mỹ Đình đã nộp một phần tiền nợ thuế